This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
news:server_migrations_il [2024/10/15 14:01] – [Tuesday 1-10-2024: 10 AM: Websites POSTPONED] jansen | news:server_migrations_il [2024/12/02 10:46] (current) – jansen | ||
---|---|---|---|
Line 32: | Line 32: | ||
===== Wednesday 16-10-2024: 9 AM: Login servers (IDP en LDAP) (next attempt) ===== | ===== Wednesday 16-10-2024: 9 AM: Login servers (IDP en LDAP) (next attempt) ===== | ||
- | For logging in, two sets of servers are in use: LDAP, which holds the database of user accounts, and the IDP servers that handle the logins and two-factor authentication on local websites (such as webmail and intranet). | + | <color #c8bfe7>For logging in, two sets of servers are in use: LDAP, which holds the database of user accounts, and the IDP servers that handle the logins and two-factor authentication on local websites (such as webmail and intranet). |
Switching the LDAP servers should be quick, just a few minutes. There are two LDAP servers so we will make sure that one is running at all times. To be sure the database is in a consistent state, password changes will not be possible around this time. | Switching the LDAP servers should be quick, just a few minutes. There are two LDAP servers so we will make sure that one is running at all times. To be sure the database is in a consistent state, password changes will not be possible around this time. | ||
+ | </ | ||
+ | ===== Tuesday 22-10-2024: 6 AM: Home disk COMPLETED ===== | ||
+ | <color # | ||
- | Switching the IDP servers may affect existing login sessions on websites, so it might be that users get logged out from webmail or intranet during this switch. | ||
- | Existing login sessions on desktops or through ssh will not be affected, and logging in on desktops will work normally. | ||
- | ===== Tuesday 22-10-2024: 10 AM: Home disk ===== | + | ===== Friday 29-11-2024 9 AM: License server DONE ===== |
- | This is the most disruptive | + | <color # |
+ | </ | ||
- | ===== (date to be announced): 10 AM: Mail ===== | + | ===== Monday 02-12-2024: 10 AM: Mail Done ===== |
- | + | <color #c8bfe7> | |
- | A new IL mail server has been prepared. During this switch, e-mail will temporarily not be available, estimated time ~ 30 minutes. | + | A new IL mail server has been prepared. During this switch, e-mail will temporarily not be available, estimated time ~ 50 minutes. |
- | Incoming mail will be delayed but will arrive once the new server is operational. | + | Incoming mail will be delayed but will arrive once the new server is operational.</ |
- | + | ||
- | + | ||
- | ===== (date to be decided): License server ===== | + | |
- | During this change, connections for reserved licenses will be disrupted (eg IDL, Mathematica) | + | |
+ | --- | ||
We will send reminders the day before we are moving one of the services. | We will send reminders the day before we are moving one of the services. | ||